Our current plan (WRMP14) and annual performance
In this section our current Water Resources Management Plan 2015-2040, called WRMP14, is available to download. Our annual report on performance against our plan is also available to download.
WRMP14
In July 2014 the Department for Environment, Food and Rural Affairs (Defra) approved the publication of our Water Resources Management Plan covering the 25-year period from 2015 to 2040, called WRMP14. This document is available to download below:
Executive summary
Technical Report (Part B)
Section 1 - Introduction and background information (0.9Mb)
Section 2 - Water Resources Program 2010-15 (0.5Mb)
Section 3 - Current and future demand for water (1Mb)
Section 4 - Current and future water supply (0.9Mb)
Section 5 - Allowing for risk and uncertainty (1.1Mb)
Section 6 - Baseline SD position (0.4Mb)
Section 7 - Appraisal of options (2Mb)
Section 8 - Programme appraisal (1.2Mb)
Technical Appendices (Part C)
These documents are available on request, by emailing
consultations@thameswater.co.uk with your name and address and we'll send you a CD.
Environmental report
On 22 August 2014 we published the SEA Post Adoption Statement with our final plan. We have since made some minor changes to the Statement and included a timeline of the main stages of the environmental assessments completed during the preparation of the plan to help the reader (Table 4.1). This revised document is published on 3 September 2014.
Annual performance
We are required to prepare an annual review of our Water Resources Management Plan to report on progress, performance data, and also any changes which have been made to the plan.
In July 2018 we submitted our annual review covering the period 2017 to 2018 to the Secretary of State. This was prepared in line with the Environment Agency (EA) guidance. The document is available for stakeholders to download below.